Warning: file_put_contents(/www/wwwroot/www.sunlit-tec.com/wp-content/uploads/unlimited_elements_cache/index.html): failed to open stream: Permission denied in /www/wwwroot/www.sunlit-tec.com/wp-content/plugins/unlimited-elements-for-elementor-premium/inc_php/framework/functions.class.php on line 4317
Global Provider for Modern Integrated Cabins and Mobile Homes

home

Product Categories

Product Categories

Space capsule

Compact modular units, some with balconies and expandable features, offering versatile living and commercial spaces.

Apple capsule

Capsule for versatile uses like quiet workspaces or gyms, designed for flexible, mobile  solutions.

Container house

Customizable, modular units ideal for shops, cafes, or multi-layered homes. Container homes suitable for various applications.

board house

Prefabricated board houses offering quick assembly and functional design.

Hot Products

Hot Products

Sunlit Tec’s most popular Manufactured and Modular Homes products can offer you a suitable, comfortable and beautiful living space.

The E2 Space Capsule with Excellent Insulation Performance is a modern integrated mobile house offered by SunlitTec. It boasts a spacious building area of 38 square meters and can comfortably accommodate 2 to 4 people. With a total power consumption of 8 kilowatts and a total net weight of 8.5 tons, the E2 demonstrates both high efficiency and stability, making it an ideal choice for those seeking a premium living experience.

Designed for efficiency and comfort, the E3 Space Capsule measures 8.5 meters in length, 3.3 meters in width, and 3.2 meters in height. It provides a practical building area of 28 square meters, ideally suited to comfortably accommodate 2 people. The E3 Space Capsule embodies SunlitTec’s commitment to delivering innovative, high-quality, and smart integrated housing solutions.

V3’s innovative two-story unit boasts a first-floor building area of 20.3m² and a second-floor area of 12.5m², providing a total of 32.8m² of efficient living space. Designed to comfortably accommodate 2 people with a total power consumption of 10KW, the V3 offers a stylish, practical, and comfortable space. It represents SunlitTec’s commitment to delivering smart integrated housing solutions that are both unique and highly functional.

The X7 Space Capsule is a sophisticated model. With a generous building area of 38m², this spacious unit is designed to comfortably accommodate 2 to 4 people, offering a versatile and efficient living or working environment. Boasting dimensions of 11.5M in length, 3.3M in width, and 3.2M in height, the X7 demonstrates SunlitTec’s commitment to delivering smart, stylish, practical, and comfortable integrated cabins. It’s an ideal choice for various applications, from unique guesthouses to functional private retreats.

Company advantages

Company advantages

home1

Professional mobile home supplier

SUNLIT TEC is a company that specializes in providing space system solutions for modern integrated cabins, mobile houses, container renovation spaces, smart communities and other aspects.

The company was formerly a professional enterprise engaged in the design, production and manufacturing of building hardware and steel structures, with a profound industrial foundation of providing product and services for European and American customers for 15 years. The company has keenly captured the aspiration and demand of the global market for modern and intelligent integrated houses. Since 2022, it has been committed to the integration and innovation of integrated houses, smart homes, smart communities and digital shops.

The company owns modern production bases with sophisticated equipment and strict management. From research and development to production, and from design to service, professional teams are reliable guarantees for ensuring the quality of projects.

The company's product line covers space capsules, apple cabins, prefabricated houses, container houses, public projects, smart supermarkets and so on. It can not only provide standardized integrated house products but also customize according to customers' needs, meet the personalized space requirements of every customer in different scenarios, and provide comprehensive and considerate integrated solutions.

Adhering to the brand concept of "stylish space, practical space, comfortable space, green space", the company is committed to making SUNLIT TEC's integrated space system renowned worldwide.

display more Read Less
0 +
Exporting Countries
0 +
Product Category
0 +
Company expansion
0 k+
Transaction amount

International Market

Our products sell well in the USA, Australia, United Arab Emirates, Germany, Finland, Denmark, Russia, South America, South Africa and some Asian countries. We are professional at OEM & ODM services. We keep updating our products line. We believe that efficiency and hard work lead to success. And we are looking forward to getting more cooperations worldwidely .

Global Regions

Global Regions

Home10sunlit-tec
USA

Home11sunlit-tec

1111

Mexico
Canada
Panama
Ecuador
El Salvador
Venezuela
Chile
Argentina
Uruguay
Bolivia
Australia
Indonesia
Philippines
Saudi Arabia
Kuwait
UAE
Oman
Qatar
Bahrain
Jordan
Egypt
Angola
Cote d'Ivoire
Kenya
Mauritius
UK
Ireland
Sweden
Finland
Norway
Portugal
Spain
Estonia
Italy
Greece
Russia
Madagascar
Lebanon
Peru
Honduras
Singapore
France
France
Netherlands
Mozambique
South Africa
Guatemala
Korea
Columbia
Dominican Republic
Uganda
Bosnia and Herzegovina
Costa Rica
Israel
Iraq
Nicaragua
Romania
Malaysia
Cyprus
Luxembourg
Vietnam
Latvia

Global Regions

Global Regions

Home10sunlit-tec
Canada
Cote d'Ivoire
UK
Peru
France
Mozambique
Guatemala
Korea
Columbia
Costa Rica
Israel
Iraq
Malaysia

Material display

Material display

The mobile house is constructed using a variety of high-quality materials, including space aluminum sheet shells, galvanized steel tubular frames, double-layer low-emissivity glass, SPC fireproof flooring and bamboo fiber boards. These materials combine lightweight, insulation, fire resistance and durability, ensuring a stable structure that is adaptable to various climatic conditions.

How to Order Capsule House from us?

How to Order Capsule House from us?

The mobile house is constructed using a variety of high-quality materials, including space aluminum sheet shells, galvanized steel tubular frames, double-layer low-emissivity glass, SPC fireproof flooring and bamboo fiber boards. These materials combine lightweight, insulation, fire resistance and durability, ensuring a stable structure that is adaptable to various climatic conditions.

Latest News

Latest News

FAQ

FAQ

Yes, we offer enhanced insulation options and structural reinforcements to withstand both hot deserts and snowy environments.

Absolutely. Our units are designed for modular stacking up to 2–3 floors, depending on foundation and local regulations.

Yes, we provide full OEM/ODM services including layout modifications, materials, and smart feature integrations.

Yes, we comply with CE, ISO9001, and other global standards. Specific regional certifications can be arranged upon request.